EP 1110-1-18
24 Apr 00
This may be accomplished by the development of two volumes as shown in Appendix C, or by
the development of a single volume with a separate cover sheet indicating the conclusions.
c. ASR Technical Review. The ASR must be technically reviewed by the district and
the OE MCX. The OE Design Center is responsible for ASR approval.
Table 7.1
Outline of Archives Search Report when Further Action is Recommended
Section
Title
1
Introduction
2
Previous Investigations
3
Site Description
4
Historical Ordnance Presence
5
Site Eligibility
6
Visual Site Inspection
7
Evaluation of Ordnance Hazards
8
Site Ordnance Technical Data
9
Other Environmental Hazards
d. USAESCH ASR Technical Advisory Group.
(1) The USAESCH ASR Technical Advisory Group (TAG) consists of representatives
from the Directorate of Engineering, the OE Design Center, and the OE MCX. The ASR TAG
is responsible for assessing the results of archives searches and providing a consensus of
strategy for subsequent response actions. Only ASRs recommending further action are
reviewed by the TAG. The TAG is not responsible for technical review of ASRs.
(2) Once an ASR recommending further action has been technically reviewed, the activity
responsible for preparing the ASR will provide the ASR along with a fact sheet to the ASR
TAG. Appendix D includes a sample ASR fact sheet to be used for this purpose.
(3) The ASR TAG will review the fact sheet, ASR, and comments; discuss the options
available; and agree on a strategy for further action. Subsequent actions recommended by the
ASR TAG may include TCRA, NTCRA (beginning with an EE/CA), a combination of TCRA
and NTRCA actions, or NDAI.
7-4