EP 1110-1-18
24 Apr 00
Table 6.1
Documents Included in the Inventory Project Report
Property Status
NOT
CATEGORICAL
ELIGIBLE
ELIGIBLE
EXCLUSION
Project Type
Documents
NDAI
OE
Yes1
MSC Commander's Memorandum
Yes
Yes
Yes
District Engineer's Memorandum
Yes
Yes
Yes
Yes
Property Survey Summary Sheet
No
No
Yes
Yes
Yes
No
Yes
Yes
Eligibility
Project Summary Sheet
No
No
No
Yes
Yes2
Project Cost Estimate
No
No
No
Yes3
Yes3
Risk Assessment Code
No
No
Categorical Exclusion Form
No
Yes
No
No
1
The OE MCX will make a project recommendation to the MSC Commander for OE projects
prior to the MSC Commander's INPR Approval Memorandum.
2
The OE Design Center will prepare the cost estimate for OE projects.
3
A Risk Assessment Code is required for all OE projects.
GENERAL NOTES:
1. The District Engineer's and MSC Commander's Memoranda are for the transmittal of the
INPR (including amendments).
2. The FDE is for the eligibility of the property. When more than one project is included in the
INPR, only one FDE, one property survey summary sheet, one District Engineer's Memo, and
one MSC Memo are needed for the INPR.
3. If an eligible property with a hazard, but no project, is being proposed due to policy
considerations, prepare a project summary sheet. There will not be a reason to have a cost
estimate with those INPRs.
6-7