EP 1110-1-17
16 Jul 99
f. After dismantling the OB/OD area, confirmation samples will be collected from the area
IAW the requirements of the Closure Plan prepared for the site. Any residual contamination will
be addressed under a follow-on Hazardous, Toxic, and Radioactive Waste (HTRW) investigation.
5-9. Documentation Requirements. Records shall be kept of all OB/OD operations. These
records shall include at a minimum the types and numbers of all ordnance destroyed, the method
of destruction (i.e. burning or detonation), and the disposition of the scrap.
5-10. Mishap Reporting and Investigation Requirements. The following information provides
AR 385-40, with USACE Supplement 1, and EM 385-1-1 for additional details on mishap
reporting requirements.
a. Reporting Criteria. All mishaps will be investigated by the contractor and reported to
the CO and Government Safety Officer or to the government authority cited in the statement of
work. See EM 385-1-1 for accident reporting and recordkeeping requirements. Any accident
will be reported on ENG FORM 3394, "Accident Investigation Report".
b. Mishap Scene. In the event of a mishap, the contractor will implement emergency
procedures and secure the scene of the mishap to keep unauthorized persons away from the
mishap scene for their protection and to preserve the evidence for the mishap investigation.
5-6