characterization of lead waste streams to be generated, and the linear and square feet of ACM
requiring disposal as a result of the project.
3.0
SUPPLEMENTAL REQUIREMENTS FOR CONTRACTED SERVICES
3.1
CONTRACTOR FIR M/PERSONNEL QUALIFIC ATIONS
3.1.1
Contractor Firm Experience
The contracted firm shall have a minimum of [ ] years experience in conducting lead/asbestos
surveys and have a qualified staff as described in Paragraph 3.1.2. [Three] references, at a
minimum, shall be required for completed projects equal in complexity to the one described in
this SOW.
3.1.2
Contractor Surveyor/Project Manager Qualifications
******************************************************************************
NOTE: Some states or local jurisdictions may use different terminology for
individuals certified to complete the services described in this SOW (i.e., the lead
certificate may include titles other than "inspector" or "risk assessor," and the
asbestos certificate may include titles other than "inspector" or "management
planner.") In addition, the state may require licensing or registration, instead of or
in addition to, certification. Include requirements specific t o the jurisdiction in
which the project is that will be completed.
******************************************************************************
The Contractor shall employ (an) accredited lead risk assessor(s) and accredited asbestos
inspector(s) [or management planner] to complete the survey activities described in this SOW.
3.1.2.1
EPA Certification
The Contractor shall provide proof in the Project Work Plan of EPA certification or other
required certifications under an EPA-approved state program pursua nt to 40 CFR 745.226 (64
FR 42849, 6 August 1999) for the lead risk assessor surveyors [and accreditation as asbestos
inspector(s) pursuant to 40 CFR Part 763 Subpart E requirements.]
3.1.2.2
Record of Experience
A resume of each surveyor ('s) experience related to the project activities of this SOW, shall be
provided as a part of the Project Work Plan.
3.1.2.3
Use of Survey Teams
******************************************************************************
NOTE: If necessary, for large, complex projects indicate the number and size of
survey teams.
******************************************************************************
[The Contractor shall specify in the Project Work Plan the number of [two] person survey teams
to be assigned to conduct the surveys. The survey leader for each team shall have a minimum of